概述:混凝土攪拌車停機(jī)后要做好的工作?What should be done well after the concrete mixer stops?1、作業(yè)后,應(yīng)整理攪拌筒,出料門及
混凝土攪拌車停機(jī)后要做好的工作?
What should be done well after the concrete mixer stops?
1、作業(yè)后,應(yīng)整理攪拌筒,出料門及出料斗,并用水沖刷,同時沖刷附加劑及供應(yīng)體系。稱量體系的刀座,刀口應(yīng)清洗潔凈,并應(yīng)確保稱量精度。
1. After the operation, the mixing drum, discharge gate and discharge hopper shall be arranged and washed with water, and the additive and supply system shall be washed at the same time. For the tool holder of weighing system, the blade should be cleaned and the weighing accuracy should be ensured.
2、冰凍季節(jié),應(yīng)放盡水泵、附加劑泵、水箱及附加劑箱內(nèi)的存水,并應(yīng)發(fā)動水泵和附加劑泵運(yùn)轉(zhuǎn)一兩分鐘。
2. In freezing season, the water pump, additive pump, water tank and additive tank should be drained, and the water pump and additive pump should be started to run for one or two minutes.
3、當(dāng)攪拌車搬運(yùn)或停用時,應(yīng)將水箱、附加劑箱、水泥、砂、石儲存料斗及稱量斗內(nèi)的物料排凈,并清洗潔凈。搬運(yùn)中,應(yīng)杠桿表頭平衡砣固定,傳感器應(yīng)卸載。
3. When the mixer truck is transported or stopped, the materials in the water tank, additive tank, cement, sand and stone storage hopper and weighing hopper shall be drained and cleaned. During transportation, the lever head balance weight should be fixed, and the sensor should be unloaded.
混凝土攪拌車生產(chǎn)效率能提高嗎?
Can the production efficiency of concrete mixer be improved?
混凝土攪拌車設(shè)備的價值首要在運(yùn)用階段,這個階段是決議攪拌車設(shè)備壽數(shù)周期長短的首要環(huán)節(jié)。任何攪拌車設(shè)備都有必定的運(yùn)用范圍和特定的運(yùn)用條件,只有滿意了其運(yùn)用范圍及條件,才干使攪拌車設(shè)備有較長的運(yùn)用壽數(shù)。預(yù)拌混凝土的出產(chǎn)、運(yùn)送、施工對預(yù)拌混凝土設(shè)備的運(yùn)用都有必定的要求和規(guī)則,尤其是泵送混凝土,假如不正確掌握泵送技能,不了解泵送條件和運(yùn)用范圍,必定導(dǎo)致泵送失利。此外、攪拌車(樓)的計量要求,攪拌車的運(yùn)送時刻等等,都要求正確運(yùn)用預(yù)拌混凝土設(shè)備,才能確保出產(chǎn),并獲得經(jīng)濟(jì)效益。
The value of concrete mixer equipment is mainly in the application stage, which is the first step to determine the life cycle of mixer equipment. Any mixer equipment has a certain range of application and specific conditions, only satisfied with the scope of application and conditions, can make the mixer equipment have a long life. The production, transportation and construction of ready mixed concrete have certain requirements and rules for the use of ready mixed concrete equipment, especially the pumping concrete. If you do not correctly master the pumping skills, you can not understand the pumping conditions and application scope, and it will lead to the failure of pumping. In addition, the measurement requirements of the mixer (building), the delivery time of the mixer and so on, all require the correct use of ready mixed concrete equipment, in order to ensure safe production and obtain economic benefits.
Thank you for reading, hope the above content is helpful to you, if you want to know more wonderful content, please click our official website: automatic mixer http://jackpetty.net .